#P1521D. Nastia Plays with a Tree

    ID: 5907 Type: RemoteJudge 3000ms 256MiB Tried: 0 Accepted: 0 Difficulty: (None) Uploaded By: Tags>constructive algorithmsdata structuresdfs and similardpdsugreedyimplementationtrees*2500

Nastia Plays with a Tree

No submission language available for this problem.

Description

Nastia has an unweighted tree with $n$ vertices and wants to play with it!

The girl will perform the following operation with her tree, as long as she needs:

  1. Remove any existing edge.
  2. Add an edge between any pair of vertices.

What is the minimum number of operations Nastia needs to get a bamboo from a tree? A bamboo is a tree in which no node has a degree greater than $2$.

The first line contains a single integer $t$ ($1 \le t \le 10\,000$) — the number of test cases.

The first line of each test case contains a single integer $n$ ($2 \le n \le 10^5$) — the number of vertices in the tree.

Next $n - 1$ lines of each test cases describe the edges of the tree in form $a_i$, $b_i$ ($1 \le a_i, b_i \le n$, $a_i \neq b_i$).

It's guaranteed the given graph is a tree and the sum of $n$ in one test doesn't exceed $2 \cdot 10^5$.

For each test case in the first line print a single integer $k$ — the minimum number of operations required to obtain a bamboo from the initial tree.

In the next $k$ lines print $4$ integers $x_1$, $y_1$, $x_2$, $y_2$ ($1 \le x_1, y_1, x_2, y_{2} \le n$, $x_1 \neq y_1$, $x_2 \neq y_2$) — this way you remove the edge $(x_1, y_1)$ and add an undirected edge $(x_2, y_2)$.

Note that the edge $(x_1, y_1)$ must be present in the graph at the moment of removing.

Input

The first line contains a single integer $t$ ($1 \le t \le 10\,000$) — the number of test cases.

The first line of each test case contains a single integer $n$ ($2 \le n \le 10^5$) — the number of vertices in the tree.

Next $n - 1$ lines of each test cases describe the edges of the tree in form $a_i$, $b_i$ ($1 \le a_i, b_i \le n$, $a_i \neq b_i$).

It's guaranteed the given graph is a tree and the sum of $n$ in one test doesn't exceed $2 \cdot 10^5$.

Output

For each test case in the first line print a single integer $k$ — the minimum number of operations required to obtain a bamboo from the initial tree.

In the next $k$ lines print $4$ integers $x_1$, $y_1$, $x_2$, $y_2$ ($1 \le x_1, y_1, x_2, y_{2} \le n$, $x_1 \neq y_1$, $x_2 \neq y_2$) — this way you remove the edge $(x_1, y_1)$ and add an undirected edge $(x_2, y_2)$.

Note that the edge $(x_1, y_1)$ must be present in the graph at the moment of removing.

Samples

2
7
1 2
1 3
2 4
2 5
3 6
3 7
4
1 2
1 3
3 4
2
2 5 6 7
3 6 4 5
0

Note

Note the graph can be unconnected after a certain operation.

Consider the first test case of the example:

The red edges are removed, and the green ones are added.